The public consultation on the 135MW project in Kythera is the most formal and institutional form of reaction. It is not just an opinion on the internet. It is a position recording in a state system. Everyone's participation is critical. If you have TAXISnet, you only need 5 minutes to defend your place. See the simple steps below.
The Public Consultation
The strongest and most formal reaction to the 135MW wind farm project.
👉 If you have a TAXISnet account, the process takes approximately 5 minutes.
👉 If you don't have one, you can register on the same site if you have VAT NUMBER
✅ Step 1 - Register or Login
- Go to https://eprm.ypen.gr/
- Log in with your TAXISnet details (username and password)
- If you don't have TAXISnet but you have a VAT number, you can create an account there.
✅ Step 2 - Find the project
- Once you're logged in, click on the “Projects/Activities in Publication - Consultation” (top right)
- Choose: “Approval of Environmental Conditions (AEPO) for Projects/Activities A1”
- In the search field, enter the number: 2408001317
- Left will appear:
«Complex of three (3) (ASPIE) with a total installed capacity of 135MW and a maximum installed capacity of 131,42MW at the sites ‘KARVOUINOLAKOS - PHOINIKIES’ (31,5 MW), ‘KORDELIDES’ (51,96 MW) & ‘XEROKABIA’ (47,9MW)».
- If it does not appear, do Disconnect (top right) and repeat Steps 1 & 2.
✅ Step 3 - Give your opinion
- Click on “Public Consultation”
- Scroll down and click on “Participation in the consultation” (blue box)
- Write your opinion
- Click to copy “Submission”
That's it! 🙌
Do it today - your voice counts!
Information: https://www.savekythera.org/